A capacity number on a datasheet is a claim, not a measurement you can compare. Here is how to read the test conditions behind it.

Capacity is not a fixed property of a LiFePO4 battery pack. It changes with discharge rate, temperature, cutoff voltage and pack age. A report that states only "100 Ah" tells a procurement manager almost nothing - the conditions around that number are what make it verifiable.

Key takeaways for procurement managers

  • Capacity depends on C-rate, temperature and cutoff voltage - a report without those conditions is not comparable.
  • Standard reference conditions are a 0.2C discharge at 25°C ±2°C with four-wire (Kelvin) sensing at the terminals.
  • The CV charge must terminate at C/20 or the stated cutoff, followed by a 20–60 minute rest; take the 2nd or 3rd cycle, never the first.
  • The report must name the exact model and Wh/Ah; measured capacity should meet declared nominal, with an agreed tolerance band at incoming inspection.
  • Reject reports with no lab accreditation, no report ID, or a single unexplained number with no test conditions.

1Why a capacity number alone proves nothing

A capacity test report is the evidence behind the amp-hour figure printed on a LiFePO4 battery pack datasheet. Two reports can show very different numbers for the same pack and both be correct, because capacity is conditional. Discharge a pack faster and internal resistance causes the voltage to reach the cutoff earlier, so less of the stored energy is delivered. Cool the pack below 20°C and the chemistry slows, reducing the measured capacity again. Neither result means the pack is defective - they simply describe different tests.

For procurement, this is the central point: a number without its test conditions cannot be compared to a competitor's number, cannot be used to reject a shipment, and cannot confirm a supplier's claim. The role of the report is to make the measurement reproducible. If another laboratory repeated the same procedure on the same model, it should obtain a similar result within a stated tolerance.

Capacity also declines with cycle count and calendar age. A fresh pack measured in a factory and the same pack measured after two years of field service are both "correct" at different states of health. Always ask whether the reported figure is an initial capacity, a rated minimum, or a value at a defined point in the cycle life.

2The test conditions a valid report must state

Four blocks of information do most of the work in a capacity report. If any one is missing, the figure loses its meaning.

A

Pre-conditioning and temperature

Condition

The pack should complete one to three baseline charge/discharge cycles to stabilise the solid electrolyte interphase, then soak at the target temperature - typically 25°C ±2°C - long enough for the core, not just the surface, to reach equilibrium. A 18650 or 21700 cell may need 2–4 hours; a large prismatic pack needs longer.

Check: the report states the soak temperature, duration and the number of pre-conditioning cycles.
B

Charge: CC-CV with a defined cutoff

Method

Charging is constant current up to the upper voltage limit, then constant voltage until the current decays to the termination threshold - commonly C/20 or C/50. Terminating the CV phase too early at C/10 leaves one to two percent of capacity unfilled and produces a repeatable but false low reading. A rest of 20–60 minutes follows before discharge.

Check: upper voltage, charge C-rate, CV cutoff current and rest time are all stated.
C

Discharge rate and cutoff voltage

Method

The industry reference for rating is a 0.2C discharge (a five-hour discharge), because it minimises the effect of internal resistance. For LiFePO4 the chemistry-specific upper and lower voltages differ from NMC - typically 3.5–3.8 V per cell at the top and around 2.5–3.0 V at the bottom, depending on the cell design. Using the wrong chemistry's cutoff makes the result meaningless.

Check: discharge C-rate and lower cutoff voltage are stated, and match the product specification.
D

Equipment and sensing

Traceability

Voltage must be measured with four-wire Kelvin sensing at the terminals; two-wire measurement includes lead resistance and can trigger early cutoff. Current accuracy directly sets capacity accuracy - a 1% error in current produces roughly a 1% error in Ah. Use a programmable cycler with data logging of voltage, current and temperature, and calculate capacity by integrating current over time.

Check: the lab names the equipment class, calibration status and measurement method.

3A seven-point report checklist

Work through these points in order. A report that fails any of the first four should be returned before you discuss price or capacity.

  1. Model identity. Does the report name the exact pack model, configuration and cell type in your purchase order?
  2. Reported value. Is capacity given in both Ah and Wh, with nominal voltage stated? Wh is the figure that matters for runtime.
  3. Test conditions. Are C-rate, temperature, cutoff voltage, charge cutoff and rest time all present?
  4. Sample and cycle. How many units were tested, and was the value taken from the 2nd or 3rd cycle rather than the first?
  5. Acceptance rule. Is the pass criterion defined - declared nominal, a minimum value, or a tolerance band?
  6. Laboratory. Is the lab named, accredited and contactable, with a unique report ID and date?
  7. Distribution. Does it show individual results or a spread, not just a single average?
Procurement tip: put the test conditions on the purchase order. Write "capacity ≥ 100 Ah measured at 0.2C, 25°C ±2°C, 2nd cycle" and you remove the most common source of disputes before they start.

4Which standard is behind the report

Different standards answer different questions. Knowing which one a report follows tells you whether it is a cell-performance document, a pack-safety document or an incoming-inspection record.

StandardScopeWhat it tells a buyer
IEC 61960-3Portable secondary lithium cells and batteriesCapacity measured under defined rate and temperature; measured capacity should meet declared nominal
IEC 62660-1Lithium-ion cells for road vehicle propulsionPerformance testing of cells, including capacity and rate capability
IEC 62619Industrial secondary lithium cells and batteriesPack-level safety and BMS function, including voltage consistency
UL 1973Fixed and auxiliary power batteriesSafety qualification of stationary battery systems
UN 38.3Transport of lithium batteriesTransport safety only - it does not certify capacity

A frequent mistake is treating a UN 38.3 test summary as proof of capacity. It is not. UN 38.3 covers transport abuse tests T1–T8; capacity is a separate performance measurement. For a LiFePO4 battery pack, ask for the capacity report separately.

5Red flags and common measurement errors

  • No test conditions. A single Ah figure with no C-rate or temperature cannot be verified.
  • Two-wire voltage sensing. Lead resistance causes early cutoff and understates capacity.
  • CV cutoff set too high. Stopping charge at C/10 instead of C/20 leaves capacity unfilled.
  • No relaxation rest. Residual polarisation depresses the initial discharge voltage and can trigger premature cutoff.
  • Insufficient thermal soak. Core temperature lag shifts capacity by one to three percent for every 5°C of error.
  • First-cycle result used. The first cycle includes irreversible capacity loss; report the 2nd or 3rd cycle.
  • Averages only. A tight mean with a long tail hides outlier cells that will end up in packs.
Important: a measured capacity below nominal is not automatically a defective cell. Before rejecting a shipment, confirm that your own verification uses the same C-rate, temperature, cutoff voltage and cycle number as the supplier's report. Different conditions produce different - but equally valid - numbers.

6Recommended RYDBATT packs

The following RYDBATT packs are supplied with documented test data and traceable production records. Request a model-specific document pack before you place an order.

Review our certification and test documentation before finalising your supplier selection.

7Frequently asked questions

Does a UN 38.3 test summary prove the pack capacity?

No. UN 38.3 covers transport abuse tests T1 to T8. It says nothing about usable amp-hours or watt-hours. Request a separate capacity test report measured under defined conditions.

Why is my measured capacity lower than the nameplate?

Most often the test conditions differ from the rating conditions. A higher discharge rate, a colder environment, a cutoff voltage set for a different chemistry, or an early CV cutoff all reduce the measured figure without indicating a defect.

Which discharge rate should a capacity report use?

The industry reference for rating is 0.2C at 25 C, as used by IEC 61960-3. If your application draws higher current, ask for an additional rate-capacity curve rather than replacing the reference test.

Why take the second or third cycle instead of the first?

The first cycle contains irreversible capacity loss and effects from storage or shipping. Later cycles give a stable, repeatable value; if results still vary by more than about one percent, more cycles are needed.

What tolerance should I accept at incoming inspection?

Incoming quality inspection commonly applies a tighter band, often around plus or minus two percent of nominal, to screen for capacity spread within a batch. Agree the band and the test conditions in writing before production.

Should I trust an average capacity from a whole batch?

No. Ask for the distribution - mean, standard deviation and full spread - and the per-cell or per-pack data for one lot. A small number of outliers can ruin pack consistency even when the average looks good.

How do I verify the testing laboratory is credible?

Check the lab name, accreditation scope and unique report ID, then confirm the report with the laboratory directly. A report with no contact details or traceable ID should be rejected.

Need the test data for a specific battery model?

Send us your target voltage, capacity and application. RYDBATT will return the relevant test reports, specification sheets and quality documents so you can verify every field before approval.

RY

RYDBATT Compliance Team

Technical writers and compliance specialists at Shenzhen RYDBATT Electronics Co., Ltd., documenting lithium battery design, testing and quality requirements for procurement and engineering teams.

Send Inquiry