Product Details:
|
|
Place of Origin: | CHINA, guangdong |
---|---|
Brand Name: | RYDBATT |
Certification: | CE ROSH UN38.3 MSDS |
Model Number: | RYD-SSE-083 (36V) |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 500 |
Price: | Negotiated The Price |
Packaging Details: | Customer requirements |
Delivery Time: | 30-45 work days |
Payment Terms: | D/P, T/T, |
Supply Ability: | 800PCS /Day |
RYDBATT SSE-083(36V) Lithium Battery Pack Redar Li-18650-10S4P-36V 10.4AhFor Electric Bicycle Battery
What should I do?
Charge your battery when it is not too cold or too hot. Let's say you just came back from a 50 mile ride and the battery is pretty warm ( you may not be able to feel it by touching the plastic case, but it does get warm). Leave it for 30 mins so it is back to the room temperature. Ideally, charge your batteries such that it does not sit fully charged for hours. So, if your morning commute starts at 7.30am, either charge your battery to 80% the night before or that early morning.
You can double the cycle life of your battery by charging it only to 80%.
1 Product Configuration
No. |
Item |
Criteria |
Remark |
1 |
Lithium-ion Battery Cell |
Li-18650 |
|
2 |
PCM |
PCM |
|
3 |
Connector |
/ |
|
2 Product Dimension and standard
Specification |
36V 7Ah-13.6Ah |
Inner size | / |
Cells | 40PCS 18650 or soft-pack battery |
Cell Franme | / |
Electric Qty Display | 4LED |
Onoff Button | / |
Charge Connector |
DC2.1 |
Fuse Holder | 15a |
Discharge Connector | 4PIN |
Lock | Mechanical lock |
Shell material |
PC+ABS |
Name |
Maximum Cells |
Connection Type |
|
Capacity |
|
SSE-083 |
40 |
10s4p |
8.8AH / 2200mAh |
10.4Ah / 2600mAh |
13.6Ah / 3400mAh |
3 Product Specification
4 PCM
Item |
Content |
Criterion |
Over charge Protection |
Over charge detection voltage |
4.250±0.050V |
Detection delay time |
1.0±0.3S |
|
Over charge release voltage |
4.150±0.050V |
|
Over discharge protection |
Over discharge detection voltage |
2.700±0.080V |
Detection delay time |
1.0±0.3S |
|
Over discharge release voltage |
3.000±0.100V |
|
Rated operational current |
≤20A |
|
Over current protection |
Primary over current detection current |
50±5A |
Primary detection delay time |
800mS-1200mS |
|
Secondary over current detection curren |
100±10A |
|
Secondary detection delay time |
50mS-200mS |
|
Short protection |
Detection condition |
>200A, 200uS-300uS |
Protection |
yes Exist |
|
Protective release condition |
Disconnect short circuit |
|
Charging management |
Charging overvoltage protection voltage |
43.5±0.4V |
Rated charging current |
3A |
|
Software overcharges |
4±0.2A |
|
Detection delay time |
300mS-600mS |
|
Temperature protection |
Charging high temperature protection temperature |
50±4℃ |
Charging protection recovery temperature |
47±4℃ |
|
Discharge high temperature protection temperature |
70±4℃ |
|
Discharge protection recovery temperature |
55±4℃ |
|
Low temperature protect temperature of charging |
0±4℃ |
|
Low temperature recovery temperature of charging |
5±4℃ |
|
Interior resistance |
Main loop electrify resistance |
≤60mΩ |
The static current |
Since the power consumption |
≤60.0uA |
NTC |
YES Exist |
10K±1% B3435±1% |
Delivery Time:
- Material Preparation Time: 7-15 days (or inventory)
- Production & Assembly Time 3-10 days
- Testing & Packaging Time: 2-10 days
- Total Delivery Time: 30-45days
- The faster delivery could be negotiable.
Factory Photo:
Contact with our sales team for your OEM and ODM order.
OEM/ODM Service:
If you want to display your own brand logo in products, bags, labels or anywhere. Or you need to develop battery packs according to your product orientation. Our OEM and ODM services are ready to do it.
Packing:
According to Stardard Export Packing.
Carton box, wooden box, wooden pallet
Ryder Electronics established in Shenzhen on July 18, 2005, mainly in the business of battery packs. In 2009 the company passed ISO9001 and improved the product quality standard to fulfill the high-end requirements from our customers.
In 2012, Ryder Electronics moved to a new facility and expend the production capacity, the Productivity improved nearly 10 times than before.
In 2013, Ryder Electronics imported ERP (SAP) system to supervise order execution process.
In 2017, Ryder Electronics expanded the SMT, imported high-speed patch machine from Germany.
Until now the factory grows into a modern enterprise which integrated injection molding, PCB designing, SMT and battery pack assembling services.
In 2018 the company passed ISO14001certification, introduced automated battery production line to further improve the production quality and capacity.